Contractor guide

How to set a minimum project size

Build a practical project minimum using travel, estimating time, setup, overhead, crew capacity and target gross profit.

A useful minimum protects capacity without forcing every project into one dollar threshold.

Reviewed September 14, 2026

Calculate the real setup cost

Include travel, estimating, ordering, mobilization, protection, cleanup, administration and likely return visits.

Segment by work type

A local diagnostic visit, a planned repair and a multi-week renovation can need different minimums or service fees.

Account for territory

Longer travel can require a higher minimum or scheduled service days in particular communities.

Communicate clearly

State the types and sizes of work you prefer. Review the minimum when costs, crew capacity or demand change.